Planning an office upgrade in the City of London: building considerations before you start

Back to Insights

Planning an office upgrade in the City of London: building considerations before you start

An office refurbishment in the City of London needs to respond to the way the building operates as well as the workplace brief. A change to meeting rooms, reception or team areas may affect shared services, access and other occupiers beyond the project boundary.

The early assessment should establish what is known, what needs investigation and which decisions depend on landlord or specialist input.

That gives the design team a practical framework for improving the office without discovering fundamental constraints after the layout has been approved.

Understand the building’s starting condition

Review the current fit-out, available drawings and the information held by facilities and building management.

Identify previous alterations and any differences between the records and the space as built. Undocumented changes can affect the assumptions behind a new design.

Consider the condition and remaining usefulness of existing elements. Some may be retained with targeted upgrades, while others require investigation or replacement.

Record the scope clearly. An office upgrade can mean anything from improving finishes to changing the services and layout. The programme and budget should reflect the actual intervention.

Clarify the boundary between tenant and landlord systems

Shared-building interfaces deserve early attention.

The office may connect to central heating and cooling, ventilation, fire alarms, access control or other landlord-managed installations. Changes to the tenant area can affect those systems.

Interface Question for the project team
Heating and cooling What capacity and controls are available for the proposed use?
Ventilation How will enclosed rooms and occupancy changes be served?
Fire-related systems What coordination is needed with the building strategy and installations?
Power and data What infrastructure is available and who approves changes?
Access and security How will construction and final occupation be managed?
Maintenance Which systems need access after the new layout is installed?

Agree the approval and commissioning process with building management. Do not assume that work contained within the tenant floor is independent of the rest of the building.

Test the layout against business activities and privacy

City offices can serve very different organisations. The brief should reflect your work rather than a generic image of a professional-services workplace.

Identify the need for confidential calls, client meetings, concentration, collaboration and specialist equipment, and understandhow those activities will coexist.

A new meeting suite may improve the client experience but place additional demand on services or reduce useful working space elsewhere. Test those trade-offs before fixing the plan.

Consider acoustic privacy and circulation together. A room can have suitable finishes yet remain poorly located if confidential visitors pass through busy team areas.

Investigate constraints in the City of London before committing to intrusive works

Where the proposal affects ceilings, raised floors, partitions or structural elements, establish what investigations are required.

Coordinate surveys so the relevant specialists receive the information they need. Access restrictions and incomplete records should be identified early rather than left as general qualifications.

If alterations affect the structure, involve the structural engineer before treating an opening or removal as a design assumption.

Review any hazardous-material considerations with the appropriate specialists. A planned upgrade should be informed by the building’s actual condition and the activities proposed.

Plan construction logistics for the specific City of London site

A City of London address does not imply one standard set of delivery arrangements. The street, building and neighbouring uses determine what is practical.

Confirm loading access, vehicle bookings, goods-lift availability and routes through shared areas. Check whether materials need to be broken down into smaller deliveries or installed in a particular sequence.

The City of London publishes construction and deconstruction guidance addressing matters including noise, liaison and working arrangements. The project team should review the current requirements and any site-specific permissions before agreeing the programme.

Do not treat an out-of-hours programme as an automatic solution. Building rules, neighbours and the nature of the activity still need to be considered.

Protect business continuity during the upgrade

Identify the activities and systems that cannot be interrupted without a coordinated plan.

For technology work, agree the responsibilities of the contractor, client IT team and specialist suppliers. Include testing and a recovery approach where appropriate.

For occupied works, define temporary routes, work areas and staff communications. A phased programme needs to show when an area is ready for use, not simply when construction activity ends.

If the floor is vacant, the building may still be operational around it. Protect shared access and facilities and coordinate any system isolation with building management.

ODGroup project example: Capgemini

ODGroup’s Capgemini project involved an 88,000 sq ft workplace across six floors on Queen Victoria Street. A staggered handover supported phased occupation.

The example illustrates the value of coordinating delivery around how the workplace will come into use. The handover sequence can be an important design and programme consideration, particularly across multiple floors.

Queen Victoria Street is in the City of London; it should not be confused with the Victoria office area around Victoria station.

Capgemini Cat B ODInteriors Furniture Flooring Colour ODMajor+ Natural Light Open Space Communal Area ODGroup Commercial Biophilia Textures Detail London Office Interior Design

Agree the handover evidence before work starts

Set out the information the facilities and operational teams need to accept the completed office.

This may include testing records, coordinated drawings, operating instructions, warranties and training. Clarify how landlord-controlled systems will be signed off and who attends demonstrations.

For client-supplied technology, agree joint testing dates rather than leaving each supplier to confirm its own package in isolation.

Record outstanding items and the arrangements for resolving them after occupation. A clear handover makes the upgraded office easier to operate and maintain.

City of London office upgrade FAQs

Can we make layout changes without altering building services?

Sometimes, but this needs assessment. Enclosed rooms, additional occupants and relocated equipment may change the requirements for lighting, ventilation, cooling and power.

Are working hours the same for every City project?

No. Review current local guidance, building requirements and site-specific arrangements. The contractor should confirm the permitted approach for the proposed activities.

Can the office remain open during the works?

Potentially, where construction can be separated and essential services maintained. The assessment should consider noise, dust, access, interruptions and the availability of temporary space.

Should we choose a full refurbishment or targeted upgrades?

Start with the operational problem and building condition. A focused intervention may be sufficient, while interdependent services or layout issues may justify a broader scope.

What is the first step in planning an office upgrade?

Prepare a clear brief and gather the building information. A coordinated site assessment can then identify surveys, technical constraints and the decisions required before design develops.

Plan the office and building interfaces together

An effective City office upgrade connects the workplace design to the systems and operations supporting it.

Explore ODGroup’s office refurbishment service to discuss your building, business requirements and delivery constraints.

Get in touch to discuss your next project

Fill out the form and we’ll get back to you shortly.

  • This field is for validation purposes and should be left unchanged.

Related posts