How to set and measure embodied carbon targets for an office fit-out

An embodied carbon target is useful when it changes decisions about what is retained, specified and built. A clear sustainability strategy connects the target to the project scope, the assessment method and the evidence the team will collect.
A percentage reduction alone is not enough. The project needs a defined baseline, consistent boundaries and a process for checking whether the design and completed works achieve the intended result.
Start early, while there is still an opportunity to change the amount of material used, retain existing elements and compare alternatives.
What is embodied carbon in an office fit-out?
Embodied carbon describes emissions associated with materials and construction processes across the relevant life-cycle stages. For a fit-out, these can include products such as partitions, finishes, furniture and services equipment, together with transport, installation, maintenance, replacement and end-of-life impacts within the assessment scope.
It differs from operational carbon, which relates to running the occupied building. A measure that reduces energy use should not automatically be presented as an embodied carbon saving.
Upfront carbon focuses on the stages before occupation. A whole-life assessment looks further ahead, using stated assumptions about future activities and service lives.
Ask the assessor to define the terminology used in the project so that everyone is discussing the same measure.
Define the assessment boundary before choosing a target
Agree what is included, the area against which results will be reported and the life-cycle stages being assessed.
A fit-out involving furniture and finishes cannot be compared directly with a building refurbishment that includes structural alterations and central plant.
| Boundary question | What to document |
| Physical scope | Floors, elements and packages included in the assessment |
| Life-cycle scope | Stages included and any exclusions |
| Area basis | The measured area used for intensity calculations |
| Time horizon | The assessment period and replacement assumptions |
| Existing materials | How retained and reused elements are treated |
| Data quality | Product information, estimates and unresolved gaps |
Use a recognised assessment methodology and an appropriately experienced assessor. For projects following the RICS whole-life carbon standard, apply the relevant requirements consistently and record departures.
Potential benefits beyond the assessment boundary should be reported separately, rather than used to obscure emissions within the project.
Establish a realistic baseline for the proposed fit-out
The baseline should represent a clearly described alternative capable of meeting the same functional brief.
Do not make the comparison artificially favourable by assuming unnecessary replacement or an unrealistic specification. Equally, avoid a baseline that excludes packages included in the proposed design.
Record quantities, materials, transport assumptions and other inputs so the comparison can be reviewed. If the brief changes substantially, assess whether the baseline also needs to change.
A baseline is most useful as a decision tool. It should help the team identify where alternatives matter, not simply provide a number against which a marketing claim can be made.
Set both an absolute carbon budget and an intensity measure
An absolute result describes the project’s total emissions within the agreed boundary. An intensity measure, often expressed in kgCO₂e per square metre, helps describe the result relative to area.
Use both where appropriate. An intensity reduction can conceal growth in total emissions if the project becomes much larger.
Consider this hypothetical example:
| Measure | Illustrative value |
| Assessed area | 2,000 m² |
| Baseline intensity | 200 kgCO₂e/m² |
| Baseline total | 400 tonnes CO₂e |
| Proposed reduction | 20% |
| Target intensity | 160 kgCO₂e/m² |
| Target total for the same area | 320 tonnes CO₂e |
These figures demonstrate the calculation only. They are not an industry benchmark or an ODGroup target.
A credible target should follow from the brief, scope and achievable interventions. It should also be challenging enough to influence decisions rather than merely confirm the starting design.
Identify the design decisions with the greatest carbon impact
Begin with quantity and retention before comparing individual product labels.
Ask whether the brief can be met with fewer new partitions, less replacement flooring or a retained ceiling system. Then assess specification alternatives for the elements that need to be new.
Evaluate building services and furniture where they fall within the scope. Leaving a significant package outside the discussion can distort the apparent priorities.
Use the assessment to focus effort. A small improvement to a high-impact package may matter more than extensive discussion about a minor finish.
Keep performance, durability and maintainability in the comparison. A product with a lower initial impact may not be the better whole-life choice if it requires more frequent replacement.
Collect product and construction evidence as the project develops
Early assessments may rely on estimated quantities and generic data. Replace assumptions with better information as the design and procurement become more certain.
Environmental product declarations can provide useful product data, but comparisons must use compatible units, scope and assumptions. An EPD is not, by itself, proof that a product is the lowest-carbon option.
Assign responsibility for collecting information from each package. Include actual product selections, quantities and relevant transport, installation and waste data.
Do not leave this request until handover. Evidence is easier to obtain when it is part of the procurement and reporting requirements.
Maintain a record of substitutions so the final assessment reflects what was installed rather than what appeared in the initial specification.
Review the carbon budget at project decision points
Use planned reviews to connect the assessment to action.
At concept stage, compare major scope and retention options. During design development, refine quantities and investigate the packages contributing most to the result. Before procurement decisions, assess proposed alternatives and unresolved data gaps.
During construction, review changes that may affect performance. At completion, update the assessment with the available as-built evidence and identify remaining assumptions.
A simple carbon change log can record the proposed change, reason, estimated impact, decision and responsible person. This makes the target part of project control rather than a separate report.
An ODGroup example: assessment informing reuse decisions
At 42 Wigmore Street, life-cycle assessments were undertaken at project milestones and reuse options were evaluated during delivery.
The project included assessing alternative approaches to raised flooring. It illustrates how measurement can inform a practical decision, rather than being used only to report a result after completion.
The project’s published performance should not be treated as a target for every fit-out. Scope, area and assessment boundaries need to be comparable first.
Report embodied carbon results clearly
State the assessment method, scope, date, area basis and life-cycle stages alongside the headline result.
Show the baseline and final outcome on a consistent basis. Explain major exclusions, data limitations and changes in the brief.
Keep actual upfront information distinct from forecasts of future replacement and end-of-life activity. Future impacts are scenario-based, even where the initial construction quantities have been verified.
Avoid describing waste diversion, a sustainability certification or a carbon offset as though it were the same as a measured reduction in project embodied carbon. Each can represent a different activity or claim.
Embodied carbon target FAQs
Is there one target suitable for every office fit-out?
No. The scope, existing condition, retained elements and assessment boundary vary. Use comparable evidence and a project-specific baseline to set a meaningful target.
Should we measure carbon per square metre or in total?
Both can be useful. Total emissions show the size of the project’s impact, while an intensity measure supports comparison where the scope and area basis are consistent.
Can reused materials be treated as having no carbon impact?
Do not assume that. Assess the relevant refurbishment, transport and installation activities using the agreed method. Reuse can reduce impact without making every associated activity emission-free.
Do environmental product declarations make products sustainable?
They provide environmental data within a defined method and scope. They need interpretation alongside technical performance, quantities and the project’s other requirements.
When should the final assessment be completed?
Complete the post-construction assessment when sufficient evidence is available to reflect the installed works. Record outstanding information and distinguish actual data from future scenarios.
Turn the carbon target into a project decision tool
A clear target links design intent, procurement and construction evidence.
Explore ODGroup’s sustainability approach to discuss how carbon assessment, retention and material decisions can be integrated into your fit-out brief.