Grainger

The details

  • Location: 3 More London Place
  • Value: £1,600,000
  • Size: 12,500 sqft
  • Duration: 13 weeks

ODInteriors has delivered a comprehensive CAT B fit-out project for Grainger at 3 More Place London. Collaborating closely with Tonik Edge, we created a sophisticated and upscale scheme tailored to Grainger’s needs.

The open-plan space required complete development across the third floor, including a welcoming reception area, a number of exclusive meeting rooms, and a vibrant café hub intended to serve as a central gathering point for the company’s staff, resulting in a full electrical installation, as well as a mechanical set-up.

Throughout the project, meticulous attention was paid to achieving high-level acoustics, a crucial aspect that significantly influenced the design and construction process. This focus was of particular importance in the executive meeting rooms, where the team worked diligently to seamlessly integrate the advanced acoustic solutions, ensuring optimal sound quality and privacy was paramount to the client.

From the initial planning stages to the final execution, we worked to ensure that each space not only met Grainger’s expectations but also provided the necessary functionality and comfort for productive meetings and collaboration.

The team

ODInteriors delivered:

  • Formation of partitions and ceilings
  • New front of house tea point (with an iconic backdrop of Tower Bridge!)
  • New back of house, tea point and shower facilities
  • New energy efficient lighting scheme
  • New state-of-the-art comms room facilities
  • Acoustic panel feature around central columns

Testimonial:

‘OD Interiors delivered our brief to the letter, successfully completing our fit out within demanding timescales. The on site team’s collaborative effort drove the project through some difficult moments, without compromising quality.

We’re all delighted with the end product achieved and happy in our new home!‘

– Dominic Wall, Grainger PLC

Working closely with the Architect

We worked closely with Tonik Edge to deliver their design, with weekly project meetings containing updates and reports on our progress as well as continual workshops to ensure that the design elements were being delivered according to their specifications.

Challenges

The team was restricted in terms of making noise during working hours. The building was occupied as a workspace throughout the project timeline and so had to make adjustments so as not to disturb occupants and so the tea, managed works to take place out of hours or on weekends.

Awards

Fit Out Awards UK 2024

Medium Sized Project: Finalist

Project Team

Mark Yates
  • ODInteriors

Mark Yates

Project Director, Core Projects

Christopher Campbell
  • ODInteriors

Christopher Campbell

Senior Project Manager

Joshua Gibson-Hunt
  • ODInteriors

Joshua Gibson-Hunt

Construction Manager

Ben Campbell
  • ODInteriors

Ben Campbell

Commercial Manager

Louie Collinson
  • ODInteriors

Louie Collinson

Technical Services Manager

Sarah Snowdon
  • ODInteriors

Sarah Snowdon

Information Manager

Get in touch to discuss your next project

Fill out the form and we’ll get back to you shortly.

  • This field is for validation purposes and should be left unchanged.