The details
- Location: 3 More London Place
- Value: £1,600,000
- Size: 12,500 sqft
- Duration: 13 weeks
ODInteriors has delivered a comprehensive CAT B fit-out project for Grainger at 3 More Place London. Collaborating closely with Tonik Edge, we created a sophisticated and upscale scheme tailored to Grainger’s needs.
The open-plan space required complete development across the third floor, including a welcoming reception area, a number of exclusive meeting rooms, and a vibrant café hub intended to serve as a central gathering point for the company’s staff, resulting in a full electrical installation, as well as a mechanical set-up.
Throughout the project, meticulous attention was paid to achieving high-level acoustics, a crucial aspect that significantly influenced the design and construction process. This focus was of particular importance in the executive meeting rooms, where the team worked diligently to seamlessly integrate the advanced acoustic solutions, ensuring optimal sound quality and privacy was paramount to the client.
From the initial planning stages to the final execution, we worked to ensure that each space not only met Grainger’s expectations but also provided the necessary functionality and comfort for productive meetings and collaboration.
The team
- Client: Grainger PLC
- Architect: Tonik Edge
- Project Manager: Core Five
- Cost Consultant: Core Five
ODInteriors delivered:
- Formation of partitions and ceilings
- New front of house tea point (with an iconic backdrop of Tower Bridge!)
- New back of house, tea point and shower facilities
- New energy efficient lighting scheme
- New state-of-the-art comms room facilities
- Acoustic panel feature around central columns
Testimonial:
‘OD Interiors delivered our brief to the letter, successfully completing our fit out within demanding timescales. The on site team’s collaborative effort drove the project through some difficult moments, without compromising quality.
We’re all delighted with the end product achieved and happy in our new home!‘
– Dominic Wall, Grainger PLC
Working closely with the Architect
We worked closely with Tonik Edge to deliver their design, with weekly project meetings containing updates and reports on our progress as well as continual workshops to ensure that the design elements were being delivered according to their specifications.
Challenges
The team was restricted in terms of making noise during working hours. The building was occupied as a workspace throughout the project timeline and so had to make adjustments so as not to disturb occupants and so the tea, managed works to take place out of hours or on weekends.
Awards
Medium Sized Project: Finalist
Project Team
- ODInteriors
Mark Yates
Project Director, Core Projects
- ODInteriors
Christopher Campbell
Senior Project Manager
- ODInteriors
Joshua Gibson-Hunt
Construction Manager
- ODInteriors
Ben Campbell
Commercial Manager
- ODInteriors
Louie Collinson
Technical Services Manager
- ODInteriors
Sarah Snowdon
Information Manager