Od provides specialist construction skills for all forms of fit-out, refurbishment and new build, from project initiation to aftercare

Our history

  • In January Jon Kearney founds Od.
  • Od’s client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers.
  • Recruitment of Commercial Director (Managing Surveyor of top fit-out company).
  • Recruitment of Construction Director (BCO & FX Quality Award winner).
  • Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic.
  • Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark.
  • Od gains Royal & Sun Alliance approved contractor status.
  • Od becomes an AIB framework contractor.
  • Od’s staff count reaches 25.
  • Od achieves British Council for Offices corporate member status.
  • Od signs 5-year lease and fits out Finsbury Square HQ.
  • Jon Kearney is a finalist in the G4C New Generation Awards – Entrepreneurship Award.
  • Od completes £4m, 107 Leadenhall, fit out.
  • Od achieves ISO 9001 status.
  • Od becomes a Rolls Royce Framework contractor.
  • Green Apple Award for Digitas, Saatchi & Saatchi.
  • Od becomes an Institute of Chartered Accountants framework contractor.
  • Company is awarded Vogue/Condé Nast HQ fit out.
  • Education sector expansion with successful fit-out projects for Partnerships for Schools and North Herts College.
  • Od appointed as Savills’ approved contractor.
  • High-end residential team acknowledged as leading contractor within sector.
  • Awarded refurbishment contract for Royal Albert Hall.
  • Forecast record turnover of circa £20m in with Business Plan.
  • Official launch of aftercare team – ZEROdEFECTS.
  • Successful completion of first Irish project for Marcus Evans HQ in Dublin.
  • Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.
  • Od appointed on Savills Estate Agency office fitout framework
  • Repeat business levels at 70% of turnover and growing
  • Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites
  • Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London
  • Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington and Hampstead
  • Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build
  • Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build
  • OD Group launch OD Solutions to cater for direct End User clients requiring a ‘one stop shop’ turnkey, Design & Build solution
  • OD Group employ 2 new company Directors, Andrew Wright to head up OD Solutions and Robert Cole to head up OD Projects the residential sector of the Group.
  • Successful completion of first laboratory project for BTG.
  • Successful completion of Kia Motors UK Headquarters in Walton Upon Thames
  • Od Solutions secure preferred partner status for Royal London Asset Management’ own nationwide corporate workspace refurbishment programme
  • Od Interiors successfully complete 25000sqft fitout for Bridgepoint Advisors at 95 Wigmore St
  • Od Solutions secure fitout for Hedge Fund Muzinich & Co, our 3rd floor within 8 Hanover St
  • Od Group celebrates ten years of delivering successful projects
  • Od Interiors successfully complete 25,000sqft two stage Cat B fit out across two floors for First State Investments in 13 weeks
  • Od Solutions successfully deliver 60,000sqft Cat B office refurbishment across floors 6 – 11 for Howard Kennedy at Number One London Bridge
  • Od Interiors continue to work with long term clients, Royal London, AIB and ICA on a range of projects across the UK
  • Od Interiors secure project for global media company delivering studio and office fit out
  • Od Projects secure prestigious 40,000sqft development in Knightsbridge working with project manager Finchatton at 38-62 Yeomans Row
  • Notable wins across the group for clients including; AGC, Leni Gas & Oil, Numis, Viridis Properties, BTG and Acadian Asset Management
  • Od Interiors appointed to deliver 26,000sqft fit out across four floors at 99 Bishops Gate for Latham & Watkins
  • Od’s commitment to sustainability continues as they work towards ISO14001
  • Od Interiors secure biggest project to date for Royal London – 80,000sqft £9m at Thames Valley Park
  • Od Interiors secures first project with M&G – 70,000sqft £7m at Stockley Park
  • Od achieve ISO14001:2004 & OHSAS 18001:2007
  • Od Solutions launch pOd – Consultative Office Furniture Procurement specialist
  • Od Solutions launch Od Petite - Service led aftercare team specialising in projects upto £250k
  • Od Interiors employ new MD Dale Harding ex Mitie Interiors MD
  • Od move to new 6,000 sq ft offices at 55 Old Broad Street
  • Od continue their charity work alongside Gensler to deliver a new HQ for Tower Hamlets Foodbank, free of charge
  • Od Interiors continue their relationship with Sky to secure a further 4 projects
  • Od Projects secure their first project with Cadogan Estates
  • Od Solutions continue their relationship with Kindred to secure their first project in Gibraltar
  • Od Group focus on their environmental impact with only 1.57% of waste generated on site going to landfill
  • Staff headcount approaches 100 full time employees
  • Od Group increase turnover to £80m
  • Od Solutions secure multi million pound framework contract with Kindred

Policies

We’re passionate about what we do, and we want to do it the right way. We believe operating with strong sustainability, quality assurance and social responsibility policies is the right way to work. We are committed to making Od a great place to work and a great company to do business with.

green

At Od Group we’re passionate about what we do, and doing it the right way.  We understand that conserving and enhancing resources for future generations and making our places of work safe  are key to protecting the environment and ensuring everyone goes home safe everyday. The environment, safety and welfare of our people is and always will be our number one priority which is why we are committed to our strategy, ‘Everyone is Responsible’.

This approach means that everyone has an important role to play to ensure the safety and wellbeing  of our colleagues, our supply chain and people within the communities we work in. By working together, looking out for one another and having the confidence to challenge unsafe practices we achieve a workplace free of injuries and minimise the impact on the environment

These goals are accomplished by consulting with our workforce, supply chain and safety consultants to ensure everyone has the right level of information, training and experience to carry out their duties safely.

Od Group is committed to fulfilling its own responsibilities in the global effort to eliminate exploitation and abuse in the workplace.
Slavery and Human Trafficking is a total infringement on fundamental human rights and so we work with the highest ethical principles in mind, valuing integrity and transparency in everything we do.

It is the policy of Od to maintain a quality management system that meets the requirements of EN ISO:9001:2015. Od’s Quality Manual defines our objectives and key procedures.

Good customer service

Customer care is an essential part of the quality process, and to ensure this is of a consistently high standard all employees receive training to ensure awareness and understanding of quality and its impact on customer service.

The requirements of Od’s quality system are mandatory and all company personnel have a responsibility to comply.

Improvement and monitoring

To ensure we maintain our high standards and continue to make improvements, our quality system is regularly reviewed and is subject to annual audit.

We believe that our people are our greatest asset and the key to our success. With this in mind, we are dedicated to providing ongoing learning and development opportunities that are strategic, measureable and effective so every employee is able to achieve personal and organisational objectives.

Od offers entry level training opportunities for college leavers through to graduates and career changers. The work that we do demands first class leadership, management and interpersonal skills. We provide comprehensive technical and on-the-job training, as well as a structured personal development programmes.

Join our team

Our business thrives on the expertise and skills of our staff. That’s why we’re always looking for people who share our commitment and enthusiasm to deliver the best.

We genuinely love what we do, if that’s how you operate too and you want responsibility, challenge and a chance to build strong relationships with clients, we’d love to hear from you.

Please send an introductory email and CV to: denise.patterson@od-group.com

News

Sign up for our newsletter. In addition to design tips, news and workplace strategies, it's a great way to keep ahead of industry legislation and updates.

2017 / 05 / 17Od Group identified in London Stock Exchange Group’s ‘1000 Companies to Inspire Britain’ report

Od Group has been identified as one of London Stock Exchange Group’s 1000 Companies to Inspire Britain. The report is a celebration of the UK’s fastest-growing and most dynamic small and medium sized businesses across the UK.

To be included in the list, companies needed to show consistent revenue growth over a minimum of three years, significantly outperforming their industry peers. More detail on the methodology can be found in the report online at www.1000companies.com.    

 Xavier Rolet, Chief Executive, London Stock Exchange Group said:

“Four years on, LSEG’s ‘1000 Companies to Inspire Britain’ report continues to highlight the dynamic, entrepreneurial and ambitious businesses across the country that are boosting UK productivity, driving economic growth and creating jobs. The strength and diversity of these companies is readily apparent with a broad mix of UK regions and sectors represented. These companies are the very heart of an ‘anti-fragile’ economy: more robust; more flexible and less prone to boom and bust. We must ensure we continue doing all we can to support high growth potential businesses like these.

 “London Stock Exchange Group is fully committed to supporting and implementing initiatives which improve access to and cut the cost of finance for growing companies. We welcome the Government’s focus on supporting SMEs as part of its Industrial Strategy and await the outcome of its review into long-term patient capital.”

The Rt Hon Greg Clark, Secretary of State for Business, Energy and Industrial Strategy:

“I want to congratulate the 1000 companies from across the UK featured in London Stock Exchange Group’s pioneering 1000 Companies to Inspire Britain report. Championing high growth innovative SMEs is crucial for the continued success of the UK economy and a country that works for everyone. We are committed to ensuring that companies of all sizes can access finance to grow, scale-up and create high quality well-paid jobs across the country.”

A full searchable database of all of the companies along with a downloadable pdf of the publication can be found online at www.1000companies.com

LSE1000

2017 / 05 / 09Od Group announced as finalist for this years Mixology Awards

We are pleased to announce that we have once again been shortlisted for ‘Fit Out Contractor of the Year’ at this year’s Mix Awards

The Mixology Awards are unique. Judged by an independent panel of experienced architects, designers, creatives and consultants, the Awards concentrate entirely on the commercial interiors market (office, hospitality, public sector and education).  This blend of relevance, independence and focus is why the Mixology Awards are deemed the best in the industry.

The winners will be announced during an awards ceremony on Thursday 22nd June at Old Billingsgate, London.

Mix2017

2017 / 05 / 02What our clients are saying

”The project at One Love Lane speaks for itself – it is a quality refurbishment and the finished product is excellent. It was clear that the project was likely to proceed from the outset; the’ strip out’ works were well organised and the building always presented in a clean tidy state. I have nothing but praise for the Od Interiors team and thank you for the outstanding job you have delivered”

Leigh Perl - Epic UK Ltd

LoveLane

2017 / 04 / 27Repeat business is the cornerstone of Od’s long-term success

Back in 2008, Od carried out the fit out of ICAEW’s business centre in Moorgate. 9 years later we have been back, alongside Rider Levett Bucknell, Perkins + Will and TB+A to refit the same space with stunning results.

ICAEW

2016 / 09 / 08Staircase Installation

As part of the fit out for a private Hedge Fund client in Mayfair, Od Solutions installed a steel and stone staircase between two floors. The design incorporated bronze balustrades with a timber handrail in keeping with the design of the staircase in the buildings main reception,

The original programme of 18 weeks for the staircase would result in the final installation being installed in a live office environment.

Although this was acceptable for the client, Od endeavoured to accelerate the programme to ensure the works were installed during the fit-out phase, reducing the programme by 2 weeks.

This two week saving was made possible through close communication with the staircase manufacturer and the design team.

Revised programme dates:

Week 1-3        Survey & Design

Week 3           Structural Calculations

Week 4           Drawing Approval

Week 5           Fabrication Drawings

Week 6           Form Structural Opening

Week 6-8        Material Procurement

Week 7-12      Manufacture

Week 10         Trimming Steel work to Opening

Week 13         Finishes

Week 14         Install landings & Stringers

Week 15         Install Treads, stone and Balustrades

Week 16         Install Handrail, lighting, soffit, final decorations and polishing

Programme saving: 2 weeks

In order to achieve this reduced programme a number of key milestones and innovations were introduced to reduce the critical path of the delivery and installation:

The building restrictions prevented the structural opening being formed during normal working hours and the location of the building (opposite The Grosvenor Hotel) prevented works outside of normal working hours.

A close working relationship with Westminster Council and “quiet” construction techniques enabled the works to be completed in 5 days without any noise complaints or interruptions.

The stone treads were sourced in Italy and templates of the treads were provided directly to the stone supplier to enable the treads to be preformed prior to shipping. This saved crucial time in the delivery of the treads which was critical in the final completion date.

The installation team worked in shifts to maximise the number of operations that could take place in a single space, for example, the stone treads were installed during the night and the balustrades were installed during the day.

The staircase was completed on time and prior to occupation ensuring no disruption to our client.

 

“ We felt Od Solutions really understood the brief and what we were trying to achieve with this significant move into one of Mayfair’s most prestigious addresses. What particularly stood out for us was the overall ability to fully coordinate the team and manage all elements of the project and develop the scheme to add unique touches and finishes to our business”

 

 

AGC4AGC5AGC2

Staircase Installation

0001 / 01 / 01Od Interiors secure largest project to date

We are pleased to announce that Od Interiors have recently secured two of their largest commercial projects to date:

M&G Investments, Stockley Park - Value: £6.5m, Cat A, 70,000 sq ft

Royal London Asset Management, Thames Valley Park Reading - Value £9m, Cat A, 80,000 sq ft

A great start to 2016 and we are looking forward to working with our client’s and their professional teams on these prestigious projects.

Stockley Park

0001 / 01 / 01Od Group will be @ MIPIM 2016

mipim2016

2015 / 08 / 04We have moved!

In 2014/2015 Od Group turnover increased from £26million to £36million. 

Our strategic growth will continue into 2015/16 with a projected turnover of in excess £50million with £35million already secured.

With controlled growth comes an increased resource requirement - our staff are now 70 strong and we were a little short of office space! We have therefore moved to a new 6,000 sqft office over one floor, at 55 Old Broad Street

55 Old Broad Street

2015 / 08 / 0414001

Od Group have established and documented an Environmental Management System (EMS) in accordance with the requirements of the International Standard BS EN 1SO 14001:2004.  During this time we have implemented, maintained and continually improved the EMS in accordance with our environmental policy.As a result of these measures, we passed our ISO 14001 stage 2 Audit in April 2015 and are now fully accredited.  The accreditation formalises the sustainable practice we had already introduced at Od Group and gives our clients confidence that we are effectively managing our environmental responsibilities as a contractor.

14001

2015 / 04 / 02Tower Hamlets Foodbank

We’re enormously proud to have worked with Gensler to deliver an attractive new administrative HQ for the wonderful people at Tower Hamlets Foodbank. Through the generosity of our subcontractors we’ve been able to deliver this project completely free of charge to Tower Hamlets so a special thanks to:

Howard Brothers – Joinery Optima – Glazing Abbey Wood Flooring – Carpets and vinyl Rox Dry Lining – Dry lining, ceilings and doors Olympiad Signs – Manifestations H&S – Decorations PIP – Electrical Edge – Mechanical MSK – Labour

The Tower Hamlets Foodbank Project is an innovative multi-faceted care delivery initiative. Those most in need in society are given emergency food parcels, enough to last them three days minimum, but importantly the Foodbank also acts as a referral point for further social services helping to ensure that people can access the help and support they need.

To find out more on how urban planning and design created Tower Hamlets Foodbank's new innovative space please click here.

Tower Hamlets Foodbank (1)

2014 / 10 / 31How to Build a Lab - a Guide from Od Interiors

The UK’s target spend on the R&D sector is set to grow to £35 billion (http://bit.ly/1pDrm8s) according to the Lisbon Treaty. As a result this are meant huge changes to our infrastructure. There is a real need, sometimes with difficulty, to retrofit some of our existing commercial spaces to meet the needs of industry.

Our recent project; a fit out for Biocompatibles UK (BTG) (http://bit.ly/1rq8lNa) encountered several challenges that were met by Od Interiors. Almost every stage of the fit out process had to be adapted in order to create these environments. Firstly, and most importantly, a services consultant with lab experience is vital. Usually we would expect design development by both the designers and architects with M&E being woven in around the design. For a lab fit out, this demands an entirely different approach.

The draw on incoming services is almost double that of a normal office space, and this has a dramatic effect on plant area needs but also subtler areas such as risers and ceiling and floor voids. By involving a talented services consultant at an early stage, our designers are armed with the limitations of the space. This ensues Od can provide better designs and reduce clashes at later stages of the project.

Extremely specialist equipment such as ATEX rated air handling for explosive environments add significant additional lead times to the early programme. Specialist furniture that is plumbed and hardwired places demands on the normal sequencing of a project. This involves trades that would not typically work together to collaborate during the construction process to ensure project success.

The programme is further compounded by the additional commissioning needs of a project with such advanced M&E services. One can expect to double the usual 2-3 week period as part of closing out. As always, a safe and clean site facilitates smooth and productive working; but of course, the need to have a carefully considered programme with appropriate sequencing is paramount.

Any main contractor approaching a lab fit out should be prepared to invest heavily in the pre-construction phase and ensure that project teams are well formed. This would also involve relevant specialist expertise and the establishment of clear and effective lines of communication between the all relevant stakeholders.

Od has now been instructed to proceed with another exciting project at BTG’s HQ based on the successful management and execution of this first phase.

If you would like to know more about the project for BTG or would like to arrange a tour please contact me on andy.torlot@od-group.com and I’ll be happy to show you around.

OD Projects_BTG Offices_Camberley_©Hufton+Crow_009

2014 / 07 / 21Recent Od wins

We are pleased to announce a number of recent project wins for the Od Interiors Team:

This includes an exciting £2m project for Second Homes Ltd to create a new co-working office space in Brick Lane for creative businesses as recently featured in the Evening Standard. We will be working with their professional team Jackson Coles and Spanish architect, Selgos Cano.

We have also just secured another fit-out project for our long-term client Royal London. The £2m project consists of the strip out and CAT B fit-out of the second and third floors of 55 Gracechurch Street, having recently completed their clients suites and reception on level 4.

Finally, Od Interiors can announce they have been appointed by Regus to deliver a CAT B project tosubdivide open plan floor space to create separate offices at 1 Canada Square, Canary Wharf.

 

New wins 02

2014 / 06 / 30Our 2014 charities are...

Od Group want to help make a positive impact on the lives of those around us and as such, each year we are proud to make a corporate donation to two specially selected charities.

In 2014 we are supporting Cystic Fibrosis, a charity promoting excellence in research and clinical care, as well as providing practical support and advice to people with cystic fibrosis and their families and Action for A-T, a charity funding high-quality research into the debilitating and life-shortening childhood illness Ataxia-Telangiectasia.

Kieran Cornwell, Senior Strategic Partnership Manager at the Cystic Fibrosis Trust said: ‘Many thanks to the Od Group for their generosity in donating to support our work in beating cystic fibrosis. Over 10,000 people in the UK live with the condition and 2.5million people carry the faulty gene, 1 in 25 of us. To achieve our goal we fund research to better understand and treat cystic fibrosis, review standards of care, and provide information and advice to the cystic fibrosis community. In 1964, a child born with cystic fibrosis was lucky to reach 5, in 2014, more than half of people reach 40. With the help of organisations like the Od Group, we can ensure people with cystic fibrosis will one day have the same opportunity to grow old as anyone else.’

As well as these initial donations, we will be organising a number of company wide events to help raise further funds for these organisation’s and continue to support them in their amazing work.

If you would like to be involved in our fundraising efforts or would like more information please contact Fran Okere.

June 2014 Charity (1)

2014 / 04 / 25New Wins!

We are pleased to announce a number of recent tender wins across Od Group:

Od Projects has just secured another refurbishment project for our long-term client - prime residential developers Finchatton. The £9m project consists of the refurbishment of five houses and four apartments in Knightsbridge covering a total of 46,500 sq ft.

Od Interiors has won a £2.7m fit out of 25,000 sq ft for First State Investments, part of the Commonwealth Bank of Australia working with Gensler, Mace and Hoare Lea. 

New wins 02

2014 / 01 / 29OD celebrate 10 years

It’s our 10 year anniversary and we are really proud of it. Od have always had a long term vision and it's been an exciting journey so far!

We look forward to what the future holds
10 yr

2013 / 10 / 11Od Projects - Eaton Square project complete

Od are thrilled to announce the completion of their Eaton Square project. Please see our case study for further information.

news